According to the size of the house, the construction line is made, in order to facilitate the accuracy of the vertical laid, ensure that the door sleeve can be installed smoothly, it is necessary to use the theodolite to hit the vertical control line of the two faces of the large corner. Then, the pre-arranged support is installed on the upper line and is to be supported on the top of the low-layer dead plate to be installed.
When the vertical line and the horizontal line are popped up, then the installed stone position line and the block line are applied according to the design drawings and actually populated the installed stone. The material is different means that the installation steps and installation processes are also different.
Note that the base bracket that is installed is cleaned up. Pay attention to the position of the component and trenches when installing the hierarchical sheet. Before installing the door of the house, it is necessary to ensure that the surface of the stone must meet the design requirements, and it should be noted that the six faces of the stone must be drunk, which is to prevent alkalization and waterproof.
When the gantry is installed, the level is adjusted, then the verticality is adjusted, it is to adjust the wall void of the stainless steel connector on the panel, until the panel is in a vertical state.At present, villas are developing in a diversified direction, while different types of door covers such as stainless steel, wood, marble have their own characteristics.
Pay attention to the connection between the branches. China Panoramic Elevators Of course, it is necessary to ensure that the stone color installed on the same surface is the same, and the stone is to be numbered in the order of the drawings and block. After installation, you can ensure that the upper and lower surfaces mounted on the marble door sleeve can be on the same level